Mae Wong dam. A stone dam project left a large clay core. That plan, construction on Hill Sobkok, location is Mae Le, Mae Wong, Nakhon Sawan. To solve the problem of flooding and to provide farmers with irrigation water in a drought page. By Mae Wong dam height 57 meters, the length is 730 meters, the width is 10 meters. Storage capacity of the reservoir is approximately 250 million cubic meters. Use the total construction budget 13,280 million. Spend time in the construction of 8 years. Then, I will talk about the construction of Mae Wong dam has problems and effect in 3 ways.
The first disadvantage is the effect about surrounding. peoples would be deforested and destroyed the ecology system.
The second disadvantage is the effect about economy and social. The Mae Wong dam has a small size. It can’t support the water from the flood because it can store water 250 million cubic meters which it is not enough and the construction take too long and more than 8 years ago. So not suitable for investment and the government used a lot of budget for construct the Mae Wong dam.
The third disadvantage is the national park areas are reduced. The animal waste the habitat. So the environment will destroy in during construction the new dam and the natural resources would be destroyed.