5. Deliverables
Three (3) copies of Topographic survey report to be delivered to KCC E&C.
Final reports are to also be provided in electronic format (AutoCAD) for reproduction by KCC E&C for the Owner and the contractor.
The successful consultant must include, at a minimum, following