Supplier need to prepare
Acceptance Criteria defined in
Measureable tolerance, agreed FI checklist shall specified tolerance align with IKEA PDOC, otherwise if it is not specified in PDOC it can be agreed with IKEA Production Engineer
Appearance tolerance, follow IKEA quality handbook if available, otherwise follow TED statement, then created limit sample shall be signed by IKEA, otherwise if no any statement the limit sample shall be agreed with IKEA.
List of limit sample (if applicable) shall be made and control (updated copied shall be arranged to IKEA – acc to “IKEA internal audit” part)