Prior to the shipment of the equipment from the factory, test reports of routine tests, as well as related drawings or diagrams (if any), shall be submitted to MEA in 6 (six) copies by the supplier as soon as available; if MEA has his own inspector, the inspector himself shall submit all the above certified test reports to MEA.