of 68 psu. In January 2006, the desalination plant was enlarged to
produce up to 68,000 m3 d1 and a second desalination plant with
the same capacity started to operate in summer 2008, when the
discharge was doubled. Following this increase in capacity, the option
of diluting the brine with seawater prior to discharge was