- Establish and implement preventive maintenance program for drainage system to ensure they are in good conditions and functioning as per design efficiency.
- Install drainage system to collect the turbid water to settling pond.
- Install drainage system with the design capacity adequate for receiving expected flow rate and volume of storm water and wastewater to prevent blockage of water stream.
- Conduct regular inspection and cleanup of drainage system to ensure adequate capacity is maintained.