5) Installation of two diagonal M 12 / VA grounding connections on the bottom side rails.
6.Installation of C - rails for panel mounting.
7) Finishing the container with an air conditioning / heating, taking into account the given electrical specifications, and in compliance with outside temperature from -20°C to +35°C.