Since the Gas Turbine exhaust feeds directly into the Heat Recover Steam Generator (HRSG)without bypass stack, it is essential to satisfy the pre-start (ready to start) permissive condition of the HRSG and STG. All Operations normally required for establishing a ready-to-start condition after an overnight shutdown can be accomplished from the central control room. These operations are manual or sequenced actions initiated by the operator.