In some production process physical units are lost through evaporation or some other natural process that is no an internal quality failure. The loss or shrinkage should be monitored to ensure that in the event an internal failure does occur, it will be detected and, if possible, corected. Nevertheless, such losses are not usually assigned cost on the grounds that such cost assignment is not practical. Instead, the total cost is absorbed by the good units that remain.