The study found that The company has expanded business. Technology has created new warehouse To accommodate the products rises. Make some space car park had been lost. Resulting in traffic congestion within the company. Make trucks that bring goods to keep them in the system for a long time. Therefore, the study projects studied ways to fix the problem. By modeling scenarios for use in process analysis, input and events that occur in the process of storage. Establish time standards and standard operating storage activities. The scope of the study since the process was weighing heavily. Storage And weigh it out of the system.
Study project conducted a study to modeling scenarios for use in process analysis, input and events that occur in the process of storage. Create time standards, and implementation of activities to reduce the storage operation. Results of the study showed that the accuracy and reliability of the model can represent the real system. Can be applied to analysis and evaluation of the various options. Add dump device simulation consists of raw sugar. Improving the call system. Can reduce the loss caused by the delay in the process of receiving and storing goods. For the creation of standard time and standard operating it. Can reduce the time to perform a complex task. Admission was causing the increase. Time each activity of the admittance and storage reduced.