SWITCH Generator No. 1 to Test On Load.
Display lights “Test On Load” and “Alternator
CB Closed” should comeon and “Auto” light will turn off.
Visually check that Main ACB is “ON” at generator switchboard behind door marked G1 800 KVA Main ACB 1600A
Repeat steps 1 & 2 For Generator No. 2 Complete “After Start” section of log sheet.
Manually close “Stand By Main ACB 2500A to Main Switchboard” behind door marked same.
Press Close button.
Go to Hotel Main Switchboard Room.
Inform Front Office GSA via telephone that the escalators will be turned off for a short period.
Inform Laundry via telephone of change over to generator power so that Dry Cleaner and Senking may be shut down.
Check “Generator Power Available” green light is on at main switchboard (located in Left corner of main switchboard).