Dear K. Joseph,
As talked about changing the fluid for truck long parking (over 1-2 years),
This is list down for oil changing as K. Montol’s information as below
1. Oil engine + oil filter + seal O-ring + Bolt washer
2. Oil Gear Box
3. Oil Rear alxe
Currently situation:-
• In parts of TCMA factory area, we can’t take any action because this area defined as the Free Zone.
• In parts of PDI track area, In practice, It can be done but incorrect operation standard that working area don’t have hole for staff go down operation and lifter for truck
which it has an affect on safety for body of staff.
Face issue problem if we will operate at PDI track area:-
• Not ready tool, equipment such as Child tray, Oil pump for filling, Equipment for take off , Air gun and Torque wrench
• We need stock raw materials that have to keep inventory all of kind oil at least 200 liters.
However, if you think that we must do, we must prepare implement everything as above details.
As well as we need to be revise quotation for labor cost and material cost to owner brand before action the operation.
Dear K. Joseph,As talked about changing the fluid for truck long parking (over 1-2 years), This is list down for oil changing as K. Montol’s information as below1. Oil engine + oil filter + seal O-ring + Bolt washer2. Oil Gear Box3. Oil Rear alxeCurrently situation:-• In parts of TCMA factory area, we can’t take any action because this area defined as the Free Zone.• In parts of PDI track area, In practice, It can be done but incorrect operation standard that working area don’t have hole for staff go down operation and lifter for truck which it has an affect on safety for body of staff.Face issue problem if we will operate at PDI track area:-• Not ready tool, equipment such as Child tray, Oil pump for filling, Equipment for take off , Air gun and Torque wrench• We need stock raw materials that have to keep inventory all of kind oil at least 200 liters.However, if you think that we must do, we must prepare implement everything as above details.As well as we need to be revise quotation for labor cost and material cost to owner brand before action the operation.