The aim of optimization is to find, for a subsystem under
research, the length of the maintenance period – operating
time to replacement of the subsystem t - which will ensure that
the unit costs expressed by eq (5) will be minimized. Our
solution of this optimization task consists in identification of
local minimum of the function cC (t) . For that, eq (7) should
be differentiated with respect to time: