Examined the signature of Assistant Manager or higher of the Production Control Section or Production Section on the selected "Quality Problem Report" dated 04/03/2015 as the evidence of review and approval the record of disposal items. We found that there was the signature of Mr. Wirat (Manager of Production Control Section) on the selected report.