Furthermore, since these drawings have just been revised, can you please make sure that the Field Engineers issue the master drawings as well as the load out plans in the WI to site? For the first two load outs (ie no.5 and no.6), please ask the FE to add text to the WI explaining that these drawings have just been revised.