Hello gents,
Please start putting together a packing list for the LG equipment that we have to take to the KKWF site. Please take into consideration that we need 190 to cw for the back mast cw and 20to on turn table ( cw brackets). Total cw needed for the operation of the crane is 220 to. Please double check all this info in the Erection_and_take-down_chart. Also we need to finalize the equipment list for the site ( trucks, trailers, Manitous ) needed for crane movement and turbine erection. As I spoke with Winai, the 400 to can move with boom facing forward with max 40 to cw ( out of 140 to total cw, this means we need to move 100 to cw + crane mats).