EPE: Refers to the “every-part-every” interval, which is a measure of process size
and length. For example, if a computer system is able to change over and
produce all required checks, regardless of type (accounts payable, payroll,
etc.), during a three-week cycle, then the batch size for each individual check
type is three weeks. Thus this process is covering every part every (EPE)
three weeks.