The following materials / equipment and manpower are required to be available:
• Soap solution and bottles for leak testing
• Pipe-fitting crew (on standby) to rectify leaks
• Tools, gaskets (various rating and sizes), ladder, safety harness etc. (for the standby Pipe-fitting crew)