In V model, based on the requirements the System test cases are prepared, and based on the HLD (High level document)the Integration Test cases are prepared, and based on the LLD(Low-level document)the Integration Test cases are prepared.
And then the coding is done. Once coding is completed, unit, integration and system testing happens in the sequence.