Concrete specimens were cured in water for
a period of 72 h at 20 2 C. Then the water cured specimens were
dried in a ventilated oven at (105 5) C to get a uniform weight
and then kept in desiccators and weighed. The density was calculated
from the total mass of water cured and oven dried specimen
as follows: