As in the site selection it was found that Kurishumala Dairy Farm consists of existing reservoir which they utilize for their industrial purpose. During rainy seasons the reservoirs get filled and the water gets over flowed resulting it to become unused. So the problem arises here is to design a micro hydro power plant utilizing the excess water which flows off during the rainy season. To attain this major task the following design problems are also to be faced