Similarly, the traditional cost system assigns 87.5% of the costs of the Product Design activity (a product-level activity) to standard stanchions even though the standard stanchions caused none of these costs. All of the costs of the Product Design activity, rather than just 12.5%, should be assigned to custom compass housings