The reason for this is the higher accuracy achieved by industrialized methods,which are a precondition for robotized work. It was also assumed that due to its expected size, the robot will be mainly operating in large halls.
The halls will either be open spaces within the exterior walls, or they will include interior columns. In any case,
partitions will preferably be erected after the tiling task has been completed.
Such partitions, drywall for
example, are very common today and have additional advantages such as flexibility in design, ease
of effecting changes in the interior layout during the life cycle of the building, etc.