Sensitivity Analyses (+/- 1 Std. Dev.) indicated no substantial changes to the plume direction, size, or longevity.
BTEX compounds reached Hiniker Pond through groundwater within 7 to 30 days of release. This conclusion is
supported by Lopez et al. (2008) research that found the quick dispersion of these compounds and in
groundwater