5.1 Problem Definition
The simulation model built is aimed at capturing the current situation at the welding stations within the scope of study.
The objective of this simulation can be presented as the total profit obtained by multiplying total floor complete and revenue. It is as follows:
The scope of study for this project involves only the first 8 welding stations that are responsible to produce the Floor Complete subassembly in the H-N welding line. These stations have a total of nine (9) operators to carry out welding operations. This study did not include breakdown of the welding guns.