When the IP had finished his duties on gas cutting, he made his way to the rest of the team and used a sledgehammer, hitting wedge, moving wall into place for welding. The U-strong back had been tack welded in two areas approximately 20mm on one side only. The correct process is to tack weld on both sides minimum 50mm.