• Stewarding need to clean the top of the wet garbage room.
• Stewarding to follow up with Engineering for boiler repair and maintenance which need to be fixed asap.
• Stewarding need to move everything out from rack storing room. Clean it as Engineering will do insulation. Date to be advised by Engineering. All racks need to be cleaned and washed before putting them back.
• Garbage room is a mess. Please make sure all cardboard boxes are flatten before throwing away. Training session on how to flatten a box will be conducted by Stewarding for outlet concerned.
• Install slippery tape on the slopes in front of the cold garbage room.
• Stewarding will raise a discard form for all broken plastic bins and stainless steel trolleys for sell. As all of these broken equipment cannot be put in the garbage area.
• Khun Adam urged all concerned to start coming down and see what is going on regularly.
• Khun Seng to arrange poster frame on the side of wooden store room (next to florist office). Please discuss with Khun Adam for more details.
• Khun Adam would like to see some solution before end of April