Would like to see the "Requisition for Clad and HIC Carbon Steel Drums, Attachment-3" so that we can confirm how the HIC CS was accepted by the local regulation in Vietnum while HIC CS is not in the ASME Sec II.
In addition to above, would like to confirm the latest requirement on the HIC CS is in line with the latest Vendor Drawings since there might have been several discussion in the project.
Highlight marks on the documents are appreciated.