MODEL APPLICATION
We applied the WinWin spiral model in four cycles:
· Cycle 0. Determine the feasibility of an appropriate
family of multimedia applications.
· Cycle 1. Develop life-cycle objectives (LCO milestone),
prototypes, plans, and specifications for individual
applications and verify the existence of at
least one feasible architecture for each application.
· Cycle 2. Establish a specific, detailed life-cycle
architecture (LCA milestone), verify its feasibility,
and determine that there are no major risks in
satisfying the plans and specifications.
· Cycle 3. Achieve a workable initial operational
capability (IOC milestone) for each project