You are now hereby instructed to HOLD the works at this location until a full detailed as-built survey of the structure and surrounding area has been carried out and concluded in full, in order to address the “Out of Tolerance” conditions as witnessed at this area, as this is affecting the installation of the BEMO roof, further more and in addition it is also affecting the installation of the aluminum shingle panels installed by PISA that affix directly onto the roof system at this location.