Dear Sir,We have dicussed the following issues in the meeting and please let me know if all points included .
1,For NAX3,need to be added R 0.6 for pin before the production,we will do which the drawing says already mentioned, logo and textured on,drawing should be sent to me,textured like Handle Base,please confirmed.
2,The shipping documents needs to be following Kingwai system,the packing and goods details tabed on the cartons etc takes time which makes the system nearly the same as Kingwai.
3,For gaskets for SPS system,need to be confirmed and to let the factory know what should be improved asap.
4,For the relationship for both sides,Please let me know whatever we should improve if any possible just let me know.You know Yuyao only supply the spare parts to you which makes me not easy to control the factories that makes we should have more conmmunication for all the points.I hope the less misunderstanding the better.