On site we don't have that 3"x3" steel at the end of the wall na ka.
There are comment on demising cap details. Can you review these details with Interior team especially area where is the walls are in odd angle or where the wall is wider such as FHC location. Please prepare sketch details of these area for our ID contractor team to review and prepare shop drawings.