.618 of the 9/30/03 low to the 2/19/04 high
(point 1 to point 3) = 5/14/04
1.0 of the 11/21/03 low to the 2/19/04 high
(point 2 to point 3) = 5/13/04
1.0 projection of the 2/19/04 high to the 3/24/04 low, projected
from the 4/6/04 high (point 3 to point 4 projected from
point 5) = 5/11/04
2.618 of the 3/24/04 low to the 4/6/04 high
(point 4 to point 5) = 5/11/04
.786 from the 2/19/04 high to the 4/6/04 high
(point 3 to point 5) = 5/13/04