Detailed comparison between rate based simulation results and experimental data from the Munmorah pilot plant was carried out, including both the CO2 absorption and regeneration processes. Effects of different operating parameters and the size of the stripper on the key target parameters in the CO2 absorption and regeneration processes were investigated. Besides, optimization analysis for the CO2 regeneration process was carried out.