Lacking to operate Boiler no.3 Over Maximum design pressure and criteria of water feed for boiler was not compliance to legal requirement e.g. pH and Harness ,TDS
Lacking to operate Boiler no.3 Over Maximum design pressure and criteria of water feed for boiler was not compliance to legal requirement e.g. pH and Harness ,TDS