Based on the estimated process parameters, the pilot operation
was scaled up, and a 900 kg astaxanthin (about 36 ton biomass) per
year facility was conceptually designed to be located in Kunming,
China, a place with more sunshine time and less temperature
variations than Shenzhen, China.