Outside Calibration: Calibration engineer inform each department about the monitor and measuring instruments need outer calibration in next month, and the user department send the measuring instrument to calibration staff two weeks before calibration period; and calibration centre will contact outer calibration institute; Inform user departments to receive the instruments attached with latest measuring certification and validity