One day after prestress transfer, the girders were moved
from the stressing bed to the storage yard with a crane.
Girders were inspected for cracking before and after lifting
and periodically while in storage. After approximately
three months in storage, the girders were trucked to the
laboratory for load testing. The three-month storage allowed
for multiple inspections of the girders to observe
and document crack growth.