I have spoken to Bongkarn last week to install our network be it cable or WIFI because I want to implement same procedure
For Assy at 2nd floor and 1st floor production. I am referring to the current system that we have implement at ARC 1, 2 and 3.
The network installation is for our internal use and Impel is not moving into building B. I think we must let their staff to link
Up with their office especially their bosses located at Hyper in Bangplee( Temporary till further notice ).