Many thanks for your advised, Inuga - san considering their business trip from 13 to 16 Oct., If following prepare can be finished. Please Waiting Confirm from me.
1. If SDS Meter installation finish, (Meter Will be install on SAT 10 or SUN 11 by Mr. Petch and Team) I’ll update to you. And For EGAT I’ll discussion about new schedule.
2. Today we have survey team for installation. That mean if can’t to installation by cut of power we can change to SAT or SUN. for safety.
3. Pre Running 15th and 16th. And the Running & monitoring from 19th Oct. this plan is possible
Update Schedule in attach files.