• 22 kV switchgear at substation A and 22 kV distribution cables from substation A to new substation shall be kept in SUPPLIER’s Scope of supply,
• 6.6 kV switchgear, 22/6.6 kV transformer, 6.6 kV power cables from transformer to the 6.6 kV switchgear and VSD module at substation B shall be deleted from SUPPLIER’s Scope of supply,
• Low voltage MCC module and power cable from MCC module to utility for compressor shall be supplied from new substation instead of substation B,