CONTRACTOR shall provide tubing route drawing in laboratory building layout in Attachment 4 ready for Laboratory building (PACKAGE 2) Contractor to prepare the location for install by CONTRACTOR with in one week after receive LOI. All fitting and sample accessory shall be supply by Swagelog. Tubing shall be installed on overhead carrier.