The Mt Carbine tenements cover approximately 367 hectares and host the historic Mt Carbine tungsten mine. The Mt Carbine mine was, up until 1987, a fully operational tungsten mine producing approximately 1,100 tonnes of tungsten per annum over a 13 year mine life. The site is fully serviced with mining infrastructure including power, water and a sealed road to Cairns at the gate. The region also hosts the necessary mining services support, including a readily available workforce. Carbine Tungsten holds a 100% interest in the Mt Carbine project.