The controls for Chilled water temperature reset / Condenser Water wetbulb reset / and Supply air temperature reset do not appear to be modeled in the Baseline case as required by Sections G3.1.3.9, G3.1.3.11, and G3.1.3.12 respectively. Please revise the Baseline model to reflect the specified temperature reset controls, and include these controls in the input parameters described in the LEED Submittal Template, Table 1.4. Please also describe any controls used in the Proposed Case.