I will try to summarize the feasibility study that we did based on the drawings you have forwarded to us.
But first I allow me to start with some questions for you:
- What is the currents status of the project? Is the construction already started? If you have some 3D renderings please send us a few.
- Besides the PB1 (which we assume is the MD) what else will you need to install in the storage room next to the garage? Same question for the pump room.