To serve for readily-realizable power system integration, our present analysis is still based on a conventional 100-
MWe steam plant with 42.5% cycle efficiency. Based on this power system assumption, we calculated 6-, 8-, 12-,
and 16-hour TES storage capacities. An estimate of material and labor indicates that the FB-TES cost could be $5–
7/kWhth, less than half of the DOE SunShot TES cost target of $15/kWhth. The cost number was derived from our
design work involving silo concrete structure, a foundation design based on the geological condition at Barstow,
California, the storage sand cost, and a preliminary insulation design. The cost estimate will be improved after
insulation design and further confirmation with the material supplier and silo builder in future development.
to support future high-efficiency power cycles including s-CO2-Brayton or air-Brayton gas-turbine combined cycles.
The high-efficiency power cycles can improve the CSP economics over the current CSP plants in the field.
ที่จะให้บริการได้อย่างง่ายดายสำหรับ-ว่าจะได้รับการบูรณาการระบบไฟฟ้า, การวิเคราะห์ในปัจจุบันของเราจะขึ้นอยู่ยังคงอยู่ในการชุมนุม 100
โรงงานอบไอน้ำได้อย่างมีประสิทธิภาพ MWe วงจร 42.5% ภายใต้สมมติฐานระบบไฟฟ้านี้เราคำนวณ 6, 8, 12,
และ TES 16 ชั่วโมงสามารถจัดเก็บ ประมาณการของวัสดุและแรงงานบ่งชี้ว่าค่าใช้จ่ายใน FB-TES อาจจะ $ 5- 7
/ kWhth น้อยกว่าครึ่งหนึ่งของ DOE SunShot TES เป้าหมายค่าใช้จ่ายของ $ 15 / kWhth ตัวเลขค่าใช้จ่ายที่ได้รับมาจากของเรา
ที่เกี่ยวข้องกับงานออกแบบไซโลโครงสร้างคอนกรีตการออกแบบฐานรากขึ้นอยู่กับสภาพทางธรณีวิทยาที่บาร์สโตว์,
แคลิฟอร์เนีย, การจัดเก็บค่าใช้จ่ายทรายและการออกแบบเบื้องต้นฉนวนกันความร้อน ประมาณการค่าใช้จ่ายจะดีขึ้นหลังจาก
การออกแบบฉนวนกันความร้อนและยืนยันต่อไปกับผู้จัดจำหน่ายวัสดุและการสร้างไซโลในการพัฒนาในอนาคต.
ให้การสนับสนุนในอนาคตที่มีประสิทธิภาพสูงรอบพลังงานรวมทั้ง s-CO2-Brayton หรือเครื่อง Brayton ก๊าซกังหันรอบรวม.
สูง รอบพลังงานอย่างมีประสิทธิภาพสามารถปรับปรุงเศรษฐศาสตร์ CSP กว่าพืช CSP ปัจจุบันในสนาม