Direct materials
Direct labor
Engineering design
Purchasing
Other overhead
Total cost
3. Work in Process = job 61 + Job 63 = $134,010 $47,400 = $181,410
4. Cost of goods sold = Job 60 + Job 62 = $16,075 + $115,890 = $231,965
5. If Job 61 required no engineering time, then the engineering applied to Job 61 would be zero and the cost of Job 61 would decrease by $400. The new Job 61 cost would be $133,610. The cost of the other three jobs would not be affected.
Direct materialsDirect laborEngineering design Purchasing Other overhead Total cost 3. Work in Process = job 61 + Job 63 = $134,010 $47,400 = $181,410 4. Cost of goods sold = Job 60 + Job 62 = $16,075 + $115,890 = $231,9655. If Job 61 required no engineering time, then the engineering applied to Job 61 would be zero and the cost of Job 61 would decrease by $400. The new Job 61 cost would be $133,610. The cost of the other three jobs would not be affected.
การแปล กรุณารอสักครู่..

วัตถุดิบทางตรง
แรงงานทางตรง
การออกแบบทางวิศวกรรม
การจัดซื้อ
อื่น ๆ ค่าใช้จ่าย
ค่าใช้จ่ายทั้งหมด3 ในการทำงานในกระบวนการ = 61 + งานงาน 63 = $ 134,010 $ 47,400 = 181,410 $ 4 ต้นทุนขาย = 60 + งานงาน = 62 + $ 16,075 $ 115,890 = 231,965 $ 5 ถ้างานจะต้องใช้เวลา 61 วิศวกรรมไม่มีแล้ววิศวกรรมมาประยุกต์ใช้กับงาน 61 จะเป็นศูนย์และค่าใช้จ่ายของงาน 61 จะลดลง $ 400 งานใหม่ 61 ค่าใช้จ่ายจะเป็น $ 133,610 ค่าใช้จ่ายของคนอื่นอีกสามงานจะไม่ได้รับผลกระทบ
การแปล กรุณารอสักครู่..