The auditor may decide to rely on the quality of other controls to provide the assurance needed to reduce substantive testing. For example, after reviewing systems development and maintenance controls, the auditor may determine that controls over
original program design and testing and subsequent changes to programs are effective.
This evidence permits the auditor to assess the risk of material program errors at a low level and thus reduce the substantive tests related to the audit objective of accuracy.