Piled foundation was evaluated through immediate settlement analysis and included analysis of the soil data from cone and dynamic
penetration tests, boreholes and laboratory tests. Soil properties were estimated from site investigation of the Elektrenai power plant and
soil exploration program according to Lithuanian standards. Pile settlement analysis showed that settlement value was 13.5 mm (pile toe
settlement), and settlement value of elastic deformation of pile from vertical compressive loads was 2.1 mm, for the most conservative
situation. For such structure, foundation settlement should not exceed 16 mm.