3.5 Deliverables
The successful consultant must include, at a minimum, following
Three (3) copies of interim report to be delivered to KCC E&C for review and comment at least two (2) weeks before the reports are finalized.
Three (3) copies of final report to be delivered to KCC E&C.
Final reports are to also be provided in electronic format (Microsoft Word, Adobe Acrobat, and AutoCAD) for reproduction by KCC E&C for the Owner and the contractor.